Cutting Edge’s Lead Times for Cabinet Doors and Other Products

Learn Cutting Edge’s lead times for custom cabinet doors, drawer boxes, and other products – plus, two ways to receive your orders faster.

A kitchen with brown stained wood cabinet doors and boxes on the countertops and floors. The lead time for your cabinet doors affects how soon you can deliver a complete kitchen.

Are inconsistent lead times and delays disrupting your projects and schedule? Lead times are critical for contractors and cabinet makers. Extended lead times upset customers and hurt your reputation, while rushed jobs can compromise quality. Without clear lead times, planning your projects becomes a guessing game. So what can you expect for lead times when you order from Cutting Edge?

At Cutting Edge, we understand how delays and broken promises affect your reputation. That’s why we aim to ship 95% of orders on their original estimated date. This promise means that we have to provide you with accurate lead times and stick to them.

In this article, you’ll learn:

The Lead Time Depends on the Product You Order

Lead times vary by product type, and understanding these details can help you plan your projects effectively. Whether you’re ordering raw cabinet doors, finished cabinet doors, or dovetail drawer boxes, you need to know the exact lead times to expect. So, let’s dive into the lead times for each product line.

Raw Cabinet Doors Ship Within 7-15 Working Days

Several factors affect the lead time for raw cabinet doors. These include the complexity of the design, the type of material used, and the finishing process. For example, custom designs or intricate woodwork typically take longer, while simple, stock designs can be produced more quickly. Additionally, the availability of raw materials and seasonal demand can influence production schedules.

A pallet with an order of raw cabinet doors bundled up and ready to ship. Raw cabinet doors take less time to produce, but require more work upon delivery.

For instance, solid wood cabinet doors require extra time because they involve detailed craftsmanship. In contrast, MDF or plywood doors often have shorter lead times due to simpler manufacturing processes.

In this section, you’ll find the standard lead times for:

Ready? Let’s dive in!

Standard Lead Time For Plywood Panel Cabinet Doors - 7-12 Working Days

Plywood panel cabinet doors have a relatively short lead time because they use plywood panels which need little labour. These doors are perfect for projects requiring quick turnaround times.

Standard Lead Time for Solid Wood Cabinet Doors - 10-15 Working Days

Solid wood cabinet doors take longer due to the detailed craftsmanship and natural wood preparation required. The process includes selecting high-quality wood, cutting, sanding, and ensuring the pieces fit seamlessly together.

Standard Lead Time for Glass Cabinet Doors - 7-10 Working Days

Glass cabinet doors are easier to produce than solid wood doors as they involve less material. However, more complex items like mullion frames take longer to make.

Standard Lead Time for 1-Piece MDF Cabinet Doors - 7-10 Working Days

These doors are simple and efficient to produce because they are made from a single piece of MDF. This eliminates the need for assembly.

Standard Lead Time for 2-Piece MDF Cabinet Doors - 7-10 Working Days

2-piece MDF cabinet doors take about the same time as 1-piece MDF doors because of the straightforward assembly process. 

Standard Lead Time for Thermofoil Cabinet Doors - 12-15 Working Days

Thermofoil doors take longer because Cutting Edge is unable to produce these doors in-house. Instead, we outsource them from Epic Doors, a supplier that has the necessary equipment.

Standard Lead Time for NEXGEN Cabinet Doors - 8-10 Working Days

NEXGEN cabinet doors are designed for modern aesthetics, using durable, pre-finished materials that are easy to work with. This efficiency reduces production time while maintaining high quality.

Standard Lead Time for Wood Veneer Slab Doors - 8-10 Working Days

Wood veneer slab doors are quick to produce because they combine natural wood veneers with engineered cores, reducing the labour needed to achieve high-quality results.

Standard Lead Time for Solid Wood Slab Doors - 8-10 Working Days

Solid wood slab doors have simple designs, making them easier to produce than more intricate solid wood cabinet doors.

Finished Cabinet Doors Take Longer to Make - 4-6 Weeks

Finished cabinet doors require an extended timeline due to the additional steps involved in sanding, staining, painting, and applying protective coatings. Each coat needs sufficient time to dry and cure, which adds to the overall production time. The detailed quality control checks at each stage ensure that the final product meets high standards. If you require custom colour matching, the process can take even longer.

The Cutting Edge showroom with many finished cabinet doors in vertical racks. Finished cabinet doors take longer to make but are ready to install.

Dovetail Drawer Boxes Typically Ship Within 2-4 Weeks

Dovetail drawer boxes are known for their strength and durability, but their design increases production time. The process involves cutting and assembling dovetail joints, sanding, and finishing to achieve a smooth surface.

Moreover, our team carefully selects and prepares high-quality wood to ensure each drawer box meets our standards. These extra steps add time but result in a product that can withstand heavy use while maintaining its appearance over time.

Dovetail drawer boxes hanging from the carts used for finishing. Dovetail drawer boxes take longer to make than cabinet doors.

2 Ways to Get Your Cabinet Doors or Dovetail Drawer Boxes Sooner

Sometimes, you need products faster than the standard timelines. What can you do when the standard lead time won’t work for you? 

When you order from Cutting Edge, you have two options:

  1. Order Online
    Placing your order online can save 1-2 working days. The system prompts you for payment at checkout – plus, you don’t need to sign a confirmation.
  2. Request a Rush Order
    For an additional fee (10% of the subtotal or $25, whichever is greater), rush orders typically ship within 3-5 working days. While this option isn’t always available due to style or scheduling, it guarantees a faster timeline. If Cutting Edge misses the date, we remove the rush fee.

Take Your First Step Towards Consistent Lead Times

In the past, managing lead times may have caused you unnecessary stress and delays. But now, with Cutting Edge, you have a partner who delivers quality products on time, every time. Now, you can take control of your schedules by ordering online or requesting a rush order.

Your next step is to learn how to order cabinet doors or drawer boxes online today.